TANAP project to enter into service in June: Turkish minister

TANAP project to enter into service in June: Turkish minister

BURSA

The Trans-Anatolian Natural Gas Pipeline (TANAP) project will enter into service as of June 12, Energy and Natural Resources Minister Berat Albayrak said on May 11.

“The opening ceremony will be held with the attendance of Turkish President Recep Tayyip Erdoğan and Azerbaijan President Ilham Aliyev on June 12,” Albayrak said during his speech at a sector meeting in the northwestern province of Bursa.

Project officials announced in April that the first gas would be pumped on June 30.

TANAP, running from the eastern province of Ardahan on the border with Georgia towards borders with Greece and Bulgaria, is the central and longest section of the Southern Gas Corridor (SGC). The main aim of the SGC is to connect the giant Shah Deniz gas field in Azerbaijan to Europe through the South Caucasus Pipeline (SCP), TANAP, and the Trans Adriatic Pipeline (TAP). The SCP runs from Azerbaijan to Turkey through Georgia and the TAP starts in Greece and runs to Italy through Albania and the Adriatic Sea.

The initial capacity of TANAP is expected to be 16 billion cubic meters (bcm) of gas per year, gradually increasing to 31 bcm. Around 6 bcm of gas will be delivered to Turkey and the remaining volume will be supplied to Europe.

Albayrak also said Turkey would start its first solo oil and gas deep-sea drilling in the Mediterranean before the end of this summer.