Timetable unveiled for Turkey's defense boost

Timetable unveiled for Turkey's defense boost

ANKARA - Anatolia News Agency
Timetable unveiled for Turkeys defense boost

A prototype of T-129 Atak helicopters co-developed by Turkey and Italian AgustaWestland is seen during a test flight. First Atak is planned to be delivered by 2013.

Turkey’s Undersecretariat for the Defense Industry has disclosed a new five-year strategic plan, which finalizes completion dates for key projects including Turkish-made tanks, aircraft, satellites, destroyers, and helicopters, in a bid to lift the country’s defense industry into a higher league. 

Altay, the Turkish-made tank project, will be complete by the end of 2015, the plan says. The first Turkish destroyer will be delivered in 2016. Atak, an attack helicopter, and Anka, an unmanned aerial vehicle, will be delivered in 2013 and 2014 respectively.

More than 280 projects have been carried out since 2011, according to the new 2012-2016 strategic plan. The total value of the contracts the undersecretariat signed last year was about $27.3 billion. 

The plan envisages Turkey’s defense industry entering the top 10 worldwide within five years. The total turnover target for defense and aerospace industry exports for 2016 is $2 billion, out of an overall industry turnover of $8 billion, according to the plan. 

Turkey will establish liaison offices in the Middle East, the Far East, the U.S., the Caucasus-Central Asia, and in Europe (EU-NATO). The undersecretariat will encourage collaboration between prime contractors, sub-industries, and small and medium enterprises, with universities and research institutions improving the technological base.

The Turkish government will support the establishment of testing and certification centers that meet international standards, in order to meet non-military and non-public sector demands. A land vehicle test center, a high-speed wind tunnel, an aerial vehicle flight test field, a missile systems test field, a satellite assembly center, and an integration and testing center will be among these facilities, according to the strategic plan.

Arms projects timetable

The strategic defense plan has laid out dates for the deadlines to manufacture the first domestically produced prototypes in the local defense industry.

  •  A radar observation satellite will be ready by 2016. 
  •  The third-generation of the main battle tank, Altay, will be manufactured by the end of 2015.
  •  The first destroyer will be delivered to the Turkish Navy by the end of 2016. Studies regarding development of a submarine will be completed by 2015.
  •  Atak, a national attack helicopter, will be delivered by 2013. An all-purpose helicopter will be delivered by the end of 2016.
  •  The mass production of a national infantry rifle starts in July.
  •  Hürkuş, a training aircraft designed by TUSAŞ, and Anka, an unmanned aerial vehicle, will be delivered to the Turkish Air Force by the end of 2015 and 2014 respectively. And a jet motor prototype will be ready by 2016.
  •  Long-range and medium-range anti-tank rocket systems will be in the inventory of the Turkish army by the end of 2012 and 2013 respectively.
  •  Semi Active Laser Guided Missile, CIRIT, will be mass produced and integrated to ATAKs by the end of 2013.
  •  Low and medium altitude air defense systems will be designed by the end of 2016.



war, arms and weapons, weapons, munitions,